Project Presentation, Admissibility and Evaluation Policy

Korea International Community of Heroes Corporation

POL-11 | Project Presentation, Admissibility and Evaluation Policy

Korea International Community Heroes Corporation (CIC HofK)

Code: POL-11
Version: 1.0
Date of issue: 9 November 2026
Date of internal application: 9 November 2026
Last updated: 9 November 2026
State of formal approval: Pending accreditation

1. Introduction and object

The Korea International Hero Community Corporation, CIC HofKrecognizes that the participation of individuals, communities, organizations and institutions in the identification of needs and project formulation is a valuable mechanism for promoting social, educational, scientific, technological, agro-industrial, cultural and international cooperation development.

This policy sets out the general principles, criteria, responsibilities and procedures applicable to the receipt, registration, admissibility, analysis, evaluation, prioritization, approval and follow-up of project proposals submitted to CIC HofK by natural persons, community groups, public or private organizations and other national or international entities.

Its purpose is to ensure that proposals are reviewed in a transparent, impartial, documented and compatible manner with the social object, existing statutes, institutional capacities and the principles of integrity and responsibility.

CIC HofK will be able to receive initiatives that meet verifiable needs, contribute to the well-being of beneficiary communities or groups and relate to one or more of its five institutional pillars: Sustainable Agricultural Development; Education and Training; Health and Welfare; Tourism and Culture; and Science, Technology and Innovation. Governance and transparency are cross-cutting functions applicable to institutional management and project evaluation.

 

The receipt of proposals does not imply that CIC HofK is obliged to finance, formulate, implement, incorporate, represent or conclude agreements with the proponents.

The institutional evaluation shall expressly distinguish between the admissibility of an initiative, its technical feasibility, its possible approval and the existence of sufficient resources to implement it.

This policy also provides for exclusions from activities incompatible with the nature and institutional purposes, measures to prevent conflicts of interest, guarantees of protection of beneficiaries and criteria for the responsible management of information and documents provided by third parties.

The search for grants, grants and funding opportunities will be regulated by the POL-10. The receipt, administration, destination and accountability of resources actually obtained will be subject to POL-05.

CIC HofK may develop complementary procedures, forms and criteria to implement this policy, without altering its principles and legal and statutory powers.

2. Responsible for implementation

The Corporation International Community Heroes of Korea (CIC HofK), NIT 901,058.307-4it is responsible for establishing appropriate mechanisms to receive, classify, evaluate and resolve proposals that it decides to incorporate into its business processes.

The General Assembly, the Board of Directors and the Legal Representation shall exercise their respective powers in accordance with the legislation and legal statutes in force.

The Legal Representation shall be responsible for acting within its powers in the presentation, approval, formalization or implementation of institutional commitments arising from projects.

Programme managers, cooperation and institutional development, or formally designated persons, may undertake the preliminary review of proposals, request information, coordinate evaluations and prepare recommendations.

The Treasury, or the relevant financial function, will participate in the evaluation of budgets, availability of resources, counterparties, sustainability and economic risks.

Legal, administrative, technological, academic and beneficiary protection functions must be involved where the characteristics of the project require specific knowledge or verification.

The persons involved in the evaluation shall declare and manage relevant conflicts of interest and maintain the reserve of information that is legally or contractually required.

No person may approve projects, commit resources, conclude agreements or assume institutional representation without sufficient authorization.

Institutional identification and official contact channels are found in the following information table, which is an integral part of this policy.

Institutional identification and contact channels

Social reason: Corporation International Community Heroes of Korea (hereinafter CIC HofK).

NIT: 901.058.307-4.

Legal nature: Non-profit entity (ESAL).

Domicile: Cartagena de Indias, Bolívar, Colombia.

Institutional direction: Manga, Avenida Jiménez, Calle 26 No. 18A-31, Cartagena de Indias, Bolívar, Colombia.

Institutional telephone: +57 605 693 0133.

Website: https: / / hofk.org /

Institutional care channels

E-mail:

Unit: Institutional care.

Consultations, requests and communications related to the institutional policies of CIC HofK may be submitted through the indicated e-mail, in accordance with the nature of the case and the applicable procedures.

For the exercise of the rights of personal data holders, the same institutional mail shall be used, preferably identifying the matter as «DPR - Personal Data Protection Request».

Confidential channel of alerts and complaints

Communications on possible irregularities, institutional non-compliance or conduct requiring confidential treatment may be submitted through the CIC HofK Whistleblower channel, managed through the Heimdal platform.

Channel access: https: / / app.heimdal.io / en / corporation-international-community-heroes-de-corea

This mechanism is independent of the regular channels of institutional care and does not replace the procedures of petitions, complaints, complaints, requests for information or proceedings before the competent authorities.

Considerations on contact channels

The physical address and the institutional phone are published as the identification and general contact information of CIC HofK. They do not, for the time being, constitute channels for formal applications for the protection of personal data or confidential complaints.

Communications shall be taken into account in accordance with their nature, the applicable institutional procedures and the terms established by Colombian law.

In the case of confidential complaints, the provisions of the Whistleblower Policy shall be further observed, including the maximum period of seven (7) working days for the acknowledgement of receipt.

3. Scope

This policy governs the ideas, initiatives, programmes, projects and activities that natural persons, communities, collectives or organizations submit for consideration by CIC HofK. It covers requests for guidance, evaluation, structure, accompaniment, cooperation, financing or implementation, whether at local, national or international level.

Education, training and access to academic opportunities; health and well-being; research, science, technology and innovation; digital transformation; sustainable rural and agro-industrial development; tourism, culture and heritage; historical memory; international cooperation; well-being of veterans and their families; community and institutional strengthening; economic and social development; civil humanitarian activities and knowledge-sharing.

Initiatives requiring third-party participation, cooperation instruments, external resources or commitments on infrastructure and beneficiaries are also included. Receiving proposals does not amount to opening a permanent public call or forcing CIC HofK to select initiatives on a continuous basis.

4. Principles of admissibility and evaluation

The receipt and consideration of proposals shall observe the following principles:

  • Legality: respect for the applicable order and the social object.
  • Social interest: potential contribution to legitimate needs and collective well-being.
  • Relevance: reasonable affinity to the mission and institutional pillars.
  • Impartiality and equality: objective criteria, without favour or unlawful discrimination.
  • Transparency and traceability: foundations and decisions documented according to their importance.
  • Proportionality: requirements appropriate to the size, stage and risk of each initiative.
  • Participation: recognition of the contributions of individuals, communities and organizations.
  • Ability and sustainability: consideration of the real conditions of development and permanence.
  • Integrity: prevention of fraud, corruption, conflicts of interest and diversion of resources.
  • Protection of beneficiaries: protection of human rights, dignity and security.
  • Responsibility: intervention and approval of the persons or bodies empowered.

5. Persons and entities empowered to submit proposals

The approach stage is open to identifiable proposers; not all people are required to have legal personality in order to formulate an initial idea.

5.1. Natural persons

They can present ideas in their personal capacity. Such a presentation does not attribute representation on a community or the ability to force third parties.

5.2. Community and collective

Approaches of community, collective and informal groups are accepted. If they move towards funding or implementation, the legal representation and responsibilities should be clarified.

5.3. Non-profit organizations

National and foreign entities whose activities are compatible may be involved, subject to proportional verification of existence, representation and capacity where necessary.

5.4. Cooperatives and productive organizations

They will be able to present initiatives on solidarity economy, rural development, sustainability and community capacity-building.

5.5. Educational and research institutions

Academic, scientific, training or knowledge transfer initiatives will be evaluated. The implementation of regulated activities will require the corresponding allotments.

5.6. Private enterprises

They may propose activities on social impact, corporate responsibility, innovation and technical cooperation. Operations which are primarily commercial must be processed under the applicable regime and not unduly presented as grants or aid.

5.7. Public entities

Its initiatives shall be subject to the applicable powers, procedures, budgetary requirements and procurement rules.

5.8. International institutions

Proposals from cooperation institutions and legitimate foreign entities may be considered. The initial contact does not involve representation, diplomatic endorsement, alliance or funding granted.

5.9. Joint proposals

A number of proposers may present a joint initiative, indicating participants and authorised interaction. Future commitments will require specific instruments where appropriate.

6. Nature of presentation and absence of automatic commitments

6.1. Reception

The sending of an idea or proposal only begins its possible institutional consideration.

6.2. No tacit approval

The acknowledgement of receipt, the preliminary discussions and the request for details do not amount to approval or to a promise of funding.

6.3. No representation

The proposer may not be present as a representative of CIC HofK or use his identity, marks or emblems without authorization.

6.4. No alliance

The review of the initiative does not in itself create a convention, labour link, service provision, sponsorship or beneficiary status.

6.5. Preparation costs

The costs incurred voluntarily by the proposer in preparing or presenting his proposal shall be the responsibility of the proposer, unless it is a prior and valid agreement to the contrary.

6.6. Continuation of the process

CIC HofK may request clarification, suspend the study, file an initiative or refrain from continuing, in compliance with the legal commitments already valid.

6.7. Formalization

A binding obligation shall be included in the relevant instrument, signed or approved by those with sufficient powers.

6.8. Voluntary, free and without automatic remuneration

The presentation of ideas, initiatives and proposals to CIC HofK is free, voluntary and free to identify opportunities that contribute to social development and community well-being.

Their receipt, registration, review or evaluation does not in itself generate rights to wages, fees, commissions, royalties, economic compensation, reimbursements, exclusivity or participation in projects or benefits arising from their eventual development.

Any economic recognition, licence, assignment, contractual participation or counterpayment shall be established by express and valid agreement between the parties, with the appropriate institutional authorisations.

The presentation also does not imply the renunciation or transfer of legally protected intellectual property rights. Their treatment shall be subject to paragraph 20 of this policy and to the applicable legislation..

7. Minimum requirements for a proposal

The initial reception will be simple. For a first approach it may be sufficient to identify the person or organization that writes, a means of contact and an understandable description of the idea. The person is not required to have formulated a technical project before sharing it.

Where progress is required, CIC HofK may request proportionally:

7.1. Identification

Name of the proposer, organization if available and valid contact.

7.2. Name of the initiative

Short name to facilitate follow-up.

7.3. Description

The need or opportunity for the proposal.

7.4. Objective

The main result is to be achieved.

7.5. Beneficiaries

Persons or communities intended to benefit.

7.6. Location

Expected place or territorial scope.

7.7. Activities

Main actions suggested.

7.8. Duration

Approximate time, if known.

7.9. Resources

Money, materials, personnel, technology or support needs, where possible.

7.10. Requested participation in CIC HofK

Type of support or interaction that you want to explore, without your request involving an obligation to provide it.

7.11. Supplementary documentation

Only where relevant may additional background, studies, permits or support be required.

8. Modalities for institutional participation

CIC HofK may decide the level of intervention it considers legitimate and viable for each proposal:

8.1. Information guidance

Share general information or identify useful public resources.

8.2. Preliminary evaluation

Determine whether the idea is related to institutional objectives.

8.3. Accompanying in formulation

To participate in the structuring of an initiative where there are authorized means and conditions.

8.4. Technical cooperation

Provide knowledge or skills that are authorized to be available and used.

8.5. Joint formulation

To prepare a project with defined obligations and functions between the parties.

8.6. Search for funding

Examine potential sources according to the POL-10, without promising to obtain resources.

8.7. Institutional implementation

To assume implementation activities only after the required approvals and formalizations.

8.8. External dissemination

To make a foreign initiative known, without taking it as its own or ensuring its results.

8.9. Non-linkage

Decide that there will be no institutional participation.

Any communication shall make clear the actual scope of the link and whether or not there is formal agreement.

9. Eligibility criteria

Admissibility is an initial review and does not amount to technical feasibility or approval. The following shall be examined:

9.1. Legitimate purpose

The purpose of the proposal must be lawful.

9.2. Relationship to the social object

There must be reasonable connection to the purposes of CIC HofK.

9.3. Identification of the proposer

It should be possible to establish responsible contact.

9.4. Understanding description

The need and the desired benefit must be understood.

9.5. No prohibited purposes

It should not include activities excluded by law or by this policy.

9.6. Initial compatibility

It should not impose obligations that the Corporation is not empowered to assume.

9.7. Authentic information

There should be no sufficiently substantiated evidence of essential supplanting or falsehood.

9.8. Acceptable risks

The risks must at least allow a legitimate further study.

10. Inadmission Causes

CIC HofK may refuse to enter into the evaluation of initiatives that pursue unlawful purposes; contravene the social object; involve excluded operational war activities; involve fraud, corruption, violence, abuse, exploitation or prohibited discrimination; seek to obtain benefits through unauthorized institutional representation; use forged documents; require permits that cannot be legally obtained; cover up commercial operations through social aid requests; require irregular use of donations; present serious unmitigable risks; or lack identification or understandable purpose after reasonable clarification is requested.

The decision shall be based on verifiable facts and criteria, without prejudice to personal characteristics. It will be preferred to allow the remediation of corrected deficiencies before deciding definitively.

11. Exclusion of military operational and military activities

The formulation, financing, support or implementation of projects that have the direct or indirect purpose of military operations, the acquisition of weapons, the provision of combat ammunition, military operational training, infrastructure or logistics directly for hostilities, tactical equipment for combat or technologies specifically designed to cause damage to such operations is excluded.

11.1. Activities excluded

The prohibition shall apply to the activities described above and to any equivalent manner for the same purposes.

11.2. Independent prohibition of financing

The exclusion does not depend on whether or not the project requests financial contributions.

11.3. Civil activities permitted

The policy does not prevent education, health and welfare initiatives, historical memory, humanitarian care, peaceful research, culture, support for veterans and families, civil reintegration, community development and peaceful international cooperation.

11.4. Nature of the proposers

Being a veteran or a member of a military institution does not determine inadmissibility. The proposed activity and its actual purpose are judged.

11.5. Dual-use technologies

The effective destination of technologies with possible civilian and military applications and their legal limitations will be reviewed.

11.6. Prohibition of circumvention

No third parties, misleading designations or indirect structures may be used to cover up prohibited activities.

12. Compatibility with institutional pillars

The proposals may contribute to one or more of the five institutional pillars of CIC HofK. The assessment shall consider the nature of the project and the proposed impact.

12.1. Education and training

Learning initiatives, educational access, strengthening of skills, technical or vocational training, rural education and knowledge exchange.

12.2. Health and Welfare

Civil initiatives for the promotion of well-being, prevention, health education, inclusion, psychosocial support and improvement of the quality of life, while respecting the qualifications required for regulated health activities.

12.3. Science, Technology and Innovation

Research, social ownership of knowledge, digital literacy, innovation, technological transformation and responsible capacity transfer.

12.4. Sustainable agricultural and industrial development

Rural productive strengthening, value chains, sustainable practices, agro-industrial training, responsible transformation and opportunities for communities linked to the territory.

12.5. Tourism and Culture

Proposals on heritage, cultural expressions, historical memory, responsible tourism, cultural education and knowledge circulation.

12.6. Cross-cutting projects and governance

An initiative can link several pillars simultaneously. The Governance and Transparency It is a cross-cutting institutional component of integrity, responsible administration and accountability; it does not constitute a sixth pillar or replace Health and Welfare.

The thematic classification will never replace controls on legality, risks, financing and institutional capacity.

13. Impact and relevance assessment

Where an idea exceeds the initial review, its social contribution may be studied by the following criteria:

13.1. Need identified

Clarity and possibility to verify the problem or opportunity.

13.2. Beneficiaries

Reasonable definition of the target population.

13.3. General interest

Contribution to legitimate social and community purposes.

13.4. Expected results

Clear and follow-up results.

13.5. Accessibility

Existing barriers and measures to reduce them.

13.6. Potential impact

Legal social, educational, health, scientific, technological, environmental, cultural or economic benefits.

13.7. Sustainability

Possibility of maintaining benefits without generating unmet obligations.

13.8. Duplication and complementarity

Relationship to existing initiatives and proposed added value.

13.9. Evidence

Diagnostics, experiences or sources to assess the proposal, if any.

13.10. Community participation

Appropriate involvement of beneficiaries in the definition of needs and solutions, where appropriate.

14. Technical and operational evaluation

14.1. Objectives

Inability and clarity of objectives.

14.2. Methodology

Coherence between actions, resources, recipients and results.

14.3. Chronogram

Time limits adjusted to the proposed activities.

14.4. Human talent

The necessary professional skills and dedication.

14.5. Infrastructure

Facilities requirements, connectivity, transport, equipment and supplies.

14.6. Technology

Licensing, maintenance, information protection and support of the planned tools.

14.7. Permissions

Identification of authorisations, licences and qualifications required.

14.8. Suppliers and exectors

Idoneity and responsibilities of relevant third parties.

14.9. Institutional capacity

Verification of functions and resources that CIC HofK can legitimately assume.

14.10. Critical units

Identification of support, approvals or resources on which the project depends.

A positive technical concept does not compromise resources or amount to final approval.

15. Financial assessment and economic sustainability

The depth of this review will be proportionate to potential financial commitments.

15.1. Budget

Cost estimate and reasonableness.

15.2. Sources of funding

Separation between available funds and resources still requested or conditioned.

15.3. Counterparties

Verification of the authorisation of own or third-party contributions.

15.4. Operating costs

Inclusion of administration, personnel, connectivity, logistics and follow-up required.

15.5. Subsequent costs

Analysis of obligations following initial funding.

15.6. Sustainability

A viable strategy to sustain results where appropriate.

15.7. Real availability

Resources which are not accredited shall not be recognized as granted.

15.8. Restrictions

strict respect for the destinations and restrictions of donated contributions and goods.

15.9. Commercial activities

Where a proposal includes operations of the Institutional Sustainability Unit (USI), the sources of funding, costs, obligations and related business activities shall be expressly identified.

As a general rule, donations and assets financed by them may not be used in commercial operations of the USI. Its exceptional use will only take place when the conditions for the express authorisation of the contributor, legal and tax compatibility, specific approval of the Board of Directors and traceability set out in the Convention and the existing statutes are met..

15.10. Authorizations

The financial review does not replace the power of the competent body to hire, commit, pay or debt.

16. Legal and regulatory evaluation

16.1. Institutional competence

Conformity with the legal powers and social object of the Corporation.

16.2. Enabling

Prior obtaining of required permits, records, licences or credits.

16.3. Contracts

Identification of the appropriate instruments for each obligation.

16.4. Public resources

Application of the relevant state regime, with no exceptions due to the nature of ESAL.

16.5. International cooperation

Analysis of relevant rules and responsibilities when foreign actors or activities are involved.

16.6. Educational activities

Distinction between informal education and offers requiring official authorization or recognition.

16.7. Health activities

Compliance with professional qualifications and standards before providing regulated services.

16.8. Activities with children

Application of safeguards and authorisations under POL-06.

16.9. Commercial activities

Real classification of counterbenefits and application of USI institutional rules.

16.10. Tax performance

Validation of the accounting and tax treatment of the relevant acts, income and expenditure.

17. Due diligence of proponents and counterparties

The verification of proponents and potential partners should be tailored to the risk, stage and complexity of each initiative.

17.1. Natural persons

Identity and ability to intervene legitimately.

17.2. Legal persons

Existence, representation and relevant powers.

17.3. Informal communities

Access to initial evaluation without requiring legal constitution; appropriate formalization before assuming obligations.

17.4. Experience

Differentiation between organizational trajectory, personal experience and actual projects.

17.5. Integrity

Proportional review of serious warnings of corruption, sanctions or unlawful conduct.

17.6. Conflicts of interest

Identification and management of relevant personal, family or economic relations.

17.7. Sources of information

Use of legitimate and privacy-friendly verifications.

17.8. Proportionality

Do not impose on an informal person or collective a burden equivalent to that of an undertaking already constituted in the initial phase.

17.9. Additional verifications

Reinforced controls before hiring, transferring money or formalizing complex agreements.

18. Protection of beneficiaries and safeguards

18.1. Dignity and rights

The activities shall respect the rights of all persons involved.

18.2. Non-discrimination

Illicit exclusionary criteria shall not be allowed.

18.3. Children and adolescents

Implementation of the POL-06 and the required authorisations.

18.4. Vulnerable persons

Additional precautions according to context and population.

18.5. Prevention of abuse and exploitation

Measures to prevent violence, harassment, abuse, abuse or the conditioning of benefits.

18.6. Consent and authorizations

Obtaining relevant permissions for activities and using information, voice or image.

18.7. Physical safety

Prevention of risks of displacement, sites, equipment and practices.

18.8. Digital security

Privacy and security controls on platforms and remote experiences.

18.9. Report of sensitive situations

Channels and proportional procedures to respond to alerts.

18.10. Precondition of implementation

No risk activities shall be initiated without the necessary safeguard measures.

19. Participation of communities and beneficiaries

19.1. Recognition of needs

Departure from identifiable needs and avoid unfounded assumptions.

19.2. Informed participation

Listen to the recipients when the nature of the initiative requires it.

19.3. Legitimate representation

Check community representation when relevant.

19.4. Communication of expectations

To explain that the preliminary phase is not a benefit granted.

19.5. No guarantees

Not to announce scholarships, quotas, aid or jobs as certain before actual approval.

19.6. Cultural respect

Recognize the particularities, freedoms and rights of communities.

19.7. Accessibility

Provide for reasonable adjustments and reduction of participation barriers.

19.8. Retrofeeding

Use feedback from beneficiaries to improve design and implementation where appropriate.

20. Intellectual property of proposals

The examination of initiatives must respect the authority, licences, legitimate secrets and other legally protected rights, distinguishing them from the general ideas offered voluntarily.

20.1. Title

The sending of a proposal does not by itself transfer copyright or other intellectual property rights to CIC HofK.

20.2. Materials provided

The studies, plans, photographs, texts, software, designs and works retain their rightful title by law or contract. The proposer shall avoid sending third-party material without sufficient authorisation.

20.3. Limited authorisation for evaluation

In submitting the proposal, the sender declares that he has the power to send it and to allow CIC HofK to receive, register, retain and review it internally for purposes of admissibility and evaluation, to the extent permitted by law and the authorizations granted. This does not constitute a general commercial operating licence or automatic publication authorisation.

20.4. Non-exclusive ideas and concepts

Communicating a generic idea, identifying a social need or suggesting a model of intervention does not, for this reason alone, confer exclusivity, contractual priority, remuneration or rights on any independent projects that may arise. Legally protected creations and valid confidentiality commitments shall be respected.

20.5. Confidential information

An appropriate confidentiality mechanism should be agreed, where appropriate, before the submission of reserved information or business secrets. The regular receipt of the form does not imply the automatic conclusion of a reservation agreement on any content provided.

20.6. Subsequent use

The publication, external reproduction, processing or exploitation of protected works will require permission, licence, contract or other sufficient legal basis. If services, payments or licences are agreed, the conditions must be expressly documented.

20.7. Joint projects

Instruments of cooperation or shared implementation shall, where appropriate, regulate prior intellectual property, contributions from the parties, ownership of results, licences of use, powers and rules of dissemination.

20.8. Conflicts

Intellectual property claims shall be processed in accordance with applicable rules and valid agreements between the parties, with the preservation of relevant evidence and timely attention.

20.9. No automatic economic rights

The voluntary contribution of an idea does not in itself give rise to the right to fees, royalties, commissions or compensation, according to number 6.8. This rule does not allow CIC HofK to ignore existing contracts or to exploit protected materials without authorization.

21. Data processing of proponents and beneficiaries

21.1. Purpose

The data will be processed to receive, register, study and respond to the initiatives, within the informed purposes.

21.2. Minimization

Information required for each stage shall be requested only.

21.3. sensitive information

Medical information, identity documents of beneficiaries or other sensitive data that is unnecessary or without adequate protection shall not be sent on general forms.

21.4. Authorizations

The treatment shall be in accordance with POL-01 and the relevant legislation.

21.5. Restricted access

Only authorized persons shall have access to the files according to their functions.

21.6. Transfer to third parties

Data shall not be shared indiscriminately; any communication to third parties shall respect the legal basis and informed conditions.

21.7. Conservation

The time limits and conditions for filing shall be in accordance with the purpose and legal obligations.

21.8. Rights of holders

Requests for consultation, updating, correction and deletion in accordance with data protection procedures shall be met.

22. Impartiality and conflicts of interest

22.1. Statement duty

Each evaluator shall inform relevant personal or economic interests in due course.

22.2. Objective evaluation

Consistent criteria and verifiable documents shall be used.

22.3. Abstention

Any person who is in conflict shall refrain when required by the POL-04 or the applicable framework.

22.4. Non-conflict authority

Decisions shall be taken by bodies or persons empowered to decide validly.

22.5. Proposals from related persons

Links with managers, partners or partners do not imply automatic acceptance or rejection; they require proportionate controls.

22.6. Indue benefits

Payments, gifts or favors aimed at altering an assessment or decision are prohibited.

22.7. Registration

Relevant conflicts, abstentions, analyses and authorizations will be documented.

23. Project prioritization

Where there are several admissible ideas and limited resources, priority criteria may be applied:

23.1. Institutional relevance

Afinity with the object, pillars and priorities validly defined.

23.2. Need

Importance and evidence of the problem addressed.

23.3. Expected impact

Scope and possibility of measuring benefits.

21.4. Feasibility

Legal, financial, technical and operational capacities.

23.5. Sustainability

Continued results and subsequent obligations.

23.6. Risks

Magnitude of risks and possible mitigation measures.

23.7. Availability of resources

There are really accessible funds and support.

23.8. Participation and complementarity

Ability to coordinate community and institutional efforts.

23.9. Documented criteria

Any matrix or weighting used must be kept and applied consistently.

23.10. Absence of acquired right

A favourable score does not generate the right to contract, finance or execution.

24. States of assessment and decision

The following states may be used for internal traceability:

24.1. Received

Registered entry without background analysis.

24.2. In preliminary review

Study of entry and admissibility requirements.

24.3. Information pending

Clarifications or support requested.

24.4. Inadmissible

It has no conditions to continue.

24.5. Admissible

It can be considered in subsequent evaluation.

24.6. In evaluation

Analysis of relevance, resources, feasibility and risks.

24.7. Vable

Positive conditions were identified, without automatic commitment.

24.8. Institutionally adopted

There is a decision of the competent body for a specific scope, subject to the conditions to be established.

24.9. Funding outstanding

The required resources have not yet been secured.

24.10. Formed

The necessary instruments have been signed validly.

24.11. Authorized for implementation

The compliance with prior start requirements was accredited.

24.12. In progress

Authorized activities in progress.

24.13. Suspended

Process temporarily interrupted for justified cause.

24.14. Closed

Finalization verified, with documented slopes where they exist.

24.15. Archived

Record kept without activity in force.

The registration of these states is of an internal nature; their disclosure requires authorization.

25. Approval authorities and powers

25.1. Legal and statutory jurisdiction

Each approval shall be subject to the valid statutes and applicable rules.

25.2. Technical evaluation

The operational concepts are advice or recommendations and do not replace formal decisions.

25.3. Legal representation

It may only assume obligations within its powers.

25.4. Steering Board

It shall resolve matters within its competence.

25.5. General Assembly

It shall intervene in the legal or statutory matters reserved.

25.6. Records and support

The basis, scope, resources, responsibilities and abstentions will be documented.

25.7. Conditional approvals

Unmet requirements may be established before committing resources.

25.8. Prohibition of tacit authorisations

Neither silence, nor registration, nor a favourable concept produce automatic approval.

25.9. Conflicts of interest

No one may use his or her functions to self-approve decisions in which he or she has an interest requiring abstention.

26. Formalization of approved projects

The appropriate legal instrument shall be determined before initiating proceedings that generate obligations.

26.1. Legal instrument

Convention, contract, cooperation agreement or other mechanism valid according to nature.

26.2. Identification of participants

Parties, representatives and powers duly identified.

26.3. Subject matter

Activities, outputs or results committed.

26.4. Resources

Vergible economic contributions and responsibilities.

26.5. Time limits

Duration, milestones and time conditions.

26.6. Responsibilities

Management, implementation, coordination and control functions.

26.7. Beneficiaries

Access criteria and protection mechanisms where necessary.

26.8. Intellectual property

Rules of title, permissions and intellectual results, according to number 20.

26.9. Personal data

Responsible for the treatment and necessary measures.

26.10. Use of marks

Permissions and limits to use party identities.

26.11. Completion

Causes, surviving obligations and treatment of balances or deliverables.

26.12. Adoption

Signature and enforcement by competent authorities.

27. Financing and preconditions for implementation

27.1. Approved funding

Differing requests, letters of interest and resources actually granted.

27.2. Budget availability

Check the ability to make commitments before starting them.

27.3. Conditional resources

To comply with donor and cooperative restrictions.

27.4. USI separation

The resources donated and the assets financed by them shall be kept separate from the commercial operations of the USI, except for exceptional uses expressly authorized under the POL-05 and the existing statutes. The approval of a project shall not replace the specific authorisations required to apply those resources.

27.5. Counterparties

Authorize and support appropriate institutional contributions.

27.6. Permissions and allotments

Get the necessary authorisations to start each regulated activity.

27.7. Personnel and suppliers

Define relevant functions, procurement conditions and verifications.

27.8. Safeguards

Activate the necessary protection measures before intervening with beneficiaries.

27.9. Initiation authorisation

The signing of an agreement does not replace the final review of availability, risks and conditions of implementation.

28. Project monitoring and evaluation

28.1. Work plan

Define deliverables, responsible, milestones and activities according to complexity.

28.2. Indicators

Establish useful and verifiable measurements where appropriate.

28.3. Resources

Control funds and assets according to the POL-05.

28.4. Evidence

Keep sufficient support for the reported results.

28.5. Beneficiaries

Protect personal information and implement safeguard measures.

28.6. Risks

Review factors that affect security, legality, costs or continuity.

28.7. Changes

Require authorisation for material changes in budget, scope, duration or parts.

28.8. Reports

To comply with the relevant contractual and institutional reports.

28.9. Results

Communicate only figures, activities and impacts based on evidence.

28.10. Learning

Document improvements and lessons for future programmes.

29. Suspension, termination and closure

29.1. Causes of suspension

There may be a lack of resources, legal impediments, critical risks or relevant non-compliance.

29.2. Protection of beneficiaries

The consequences of any interruption on its recipients shall be assessed.

29.3. Existing obligations

The termination does not eliminate validly assumed commitments.

29.4. Resources

Administration and return of funds or assets in accordance with their conditions.

29.5. Information

Preservation of legally enforceable evidence and records.

29.6. Communication

Notification to those concerned according to the instrument and context.

29.7. Closure

Preparation of a final record of achievements, outstanding and resources, as appropriate.

30. Communication of projects and institutional relations

30.1. Proposals received

They will not be announced as approved projects.

30.2. Projects under evaluation

Intellectual rights, confidentiality and disclosure permits shall be respected.

30.3. Approved projects

Their true conditions and scope shall be indicated.

30.4. Projects financed

It will not be claimed that there is funding if only it has been requested or negotiated.

30.5. Conventions and institutional relations

Only the instruments actually formalized will be presented as conventions; the exploratory approaches will have to be identified as such and evidence of mutual interest will be available when published.

30.6. Marks

The third-party emblems require the appropriate authorisations according to the POL-03.

30.7. Dissemination of external initiatives

Sharing third-party opportunities does not amount to sponsoring, administering or responding to them.

30.8. Testimonies and photographs

They shall be used within the necessary permits according to POL-01, POL-02 and POL-06.

30.9. Artificial intelligence

No visual or narrative evidence of non-existing activities, persons or agreements shall be produced.

30.10. Transparency

Plans, ongoing activities and demonstrated results will be clearly distinguished.

31. Consultations, submission of proposals and reviews

CIC HofK may enable official forms and channels to receive messages and initiatives. The first communication may be brief: name, contact and description of the idea. If the proposal progresses, additional information will be requested according to number 7.

The case may be used for electronic communications «PRO - Project presentation or consultation».

The proponent may indicate, when known, the initiative name, target population, location and type of collaboration he wishes to explore. You do not need to submit a full budget or technical file from the first contact.

The confirmation of receipt does not approve or finance the proposal. CIC HofK may request clarification and communicate decisions that are proportionate to the applicable stage and framework. Additional information may be received or reconsidered where the procedure allowed; this does not constitute an automatic administrative remedy or guarantee a favourable decision.

Cases related to fraud, corruption and conflicts of interest will be channelled in accordance with the POL-04.

32. Records and evidence of evaluation

Efforts will be made to maintain internal files commensurate with the status and risk of the initiative. They may, as appropriate, include identifier, date, proposer, contact, description, territory, beneficiaries, relation to pillars, status, requirements, responsible, assessments, risks, declared conflicts, budget, planned funding, concepts, authorisations, contracts, monitoring and closure.

In forms which include free presentation and data processing conditions, evidence of the acceptance expressed by the proposer and the version of the conditions applicable at the time of dispatch shall be kept.

The files shall be protected by the POL-01 and the POL-07. Restricted information shall not be subject to unauthorized public disclosure.

33. Institutional responsibilities

  • General Assembly: to exercise the higher powers which are applicable to it.
  • Board of Directors: establish guidelines, monitor risks and resolve reserved subjects.
  • Legal representation: make commitments within their powers.
  • Programme managers: study and coordinate formulation, implementation and follow-up when designated.
  • Cooperation and institutional development: identify opportunities and support authorized efforts.
  • Treasury: analyse budgets, resources, balances and sustainability.
  • Accounting function: examine records and accounting treatments according to their competence.
  • Legal advice: review contractual and regulatory matters that require it.
  • Protection of beneficiaries: define and verify safeguards.
  • Marketing and communications: validate public content, permissions and real name of relationships.
  • Institutional information: receive and channel communications without taking decision-making powers.

These allocations do not automatically create jobs, delegations or authorization to hire or manage resources.

34. Non-compliance and corrective measures

In the event of an irregularity, measures for clarification or rectification, review of the file, suspension of the study, archiving, reassessment of conflicts, restriction of access, review of instruments, enhanced protection, recovery of required remedies, contractual or disciplinary actions and communications to authorities where appropriate may be taken on a proportionate basis by the competent authority.

Any action must respect the applicable guarantees, due process and institutional competence.

35. Relationship to other institutional policies

The implementation of this policy shall be coordinated with the following provisions:

  • POL-01: Personal Data Processing and Cookies.
  • POL-02: Image, Voice, Intellectual Property and Copyright.
  • POL-03: Marketing, Advertising, Marks and Communications.
  • POL-04: Ethics, Integrity, Transparency and Good Governance.
  • POL-05: Donations, Cooperation and Responsible Resource Management.
  • POL-06: Protection of minors and beneficiaries.
  • POL-07: Information Security and Responsible Use of General Artificial Intelligence.
  • POL-08: Safety, Health, Welfare and Working Coexistence.
  • POL-09: Consumer Protection and Responsible Business Practices.
  • POL-10: Resources, Grants and Institutional Support Platforms.

The POL-11 regulates the reception and evaluation cycle of proposals; the POL-10, the search for resources; and the POL-05, its receipt, administration and accountability when obtained.

In case of doubt, these provisions shall be interpreted in accordance with the law, the legal statutes in force and the applicable institutional acts.

36. Legal and policy framework

This policy is developed within the Colombian system applicable to non-profit entities and to specific cooperation and project actions, in particular: Constitution; civil and commercial legislation; Tax Statute and Decree 1625 of 2016 where applicable; Law 1581 of 2012 on personal data; Law 1098 of 2006 on the protection of minors; Law 23 of 1982 and Law 1915 of 2018 on copyright; Law 2195 of 2022 as appropriate; State procurement regime, including Law 80 of 1993 as appropriate; Decree 092 of 2017 only in its applicable cases; sectoral regulation of proposed activities; relevant international cooperation rules and legal statutes;

ISO 37000, ISO 31000, ISO 37301 and ISO 9001 may be consulted voluntarily as good practice references. Their mention does not constitute a declaration of certification or replace the particular requirements of each project.

37. Watch, review and update

The present POL-11 takes as antecedent version 1.0 issued the 9 November 2026. The present wording constitutes a proposal for an update and its formal application must be credited with the decision of the competent authority or body. No approval, record, decision or registration which has not been effectively issued or made shall be presumed to exist.

The policy may provisionally guide internal management in that which does not require a specific formal act; this does not replace the powers of the General Assembly, the Board of Directors or the Legal Representation, or the necessary authorizations for the implementation of regulated activities, the conclusion of contracts or the commitment of resources.

The publication on the website must identify code, approved version, date of validity, approving authority and effective update. If the formal approval of the previous version remains to be credited, this must be shown without ambiguity.

The conditions for the voluntary contribution of ideas, the absence of automatic remuneration and the treatment of intellectual property shall apply to new submissions when properly reported and accepted where appropriate; they shall not retroactively alter previous contracts or authorisations.

Regular review shall be carried out at least once a year and extraordinary review shall be carried out where there are regulatory changes, incidents or institutional changes that warrant it. Any update shall be documented and communicated through the relevant channels.

This policy does not constitute a permanent call or set up an evaluation committee. The formal version will be made available on the official website of CIC HofK.

Korea International Community Heroes Corporation (CIC HofK)
Cartagena de Indias, Colombia.
Document: POL-11.